{"id":145,"date":"2016-11-04T17:05:31","date_gmt":"2016-11-04T17:05:31","guid":{"rendered":"http:\/\/www.energy365.com\/advertising\/?post_type=tribe_events&#038;p=145"},"modified":"2016-12-07T12:11:25","modified_gmt":"2016-12-07T12:11:25","slug":"canesis-3","status":"publish","type":"tribe_events","link":"https:\/\/www.energy365.com\/advertising\/advert\/canesis-3\/","title":{"rendered":"Canesis"},"content":{"rendered":"<p><a href=\"http:\/\/www.canesis.net\/Non-Proprietary\/Non-Proprietary.htm\">Canesis Data Limited &#8211; South East Asia Project updates<\/a><\/p>\n<p>Myanmar &#8211; ANDAMAN SEA and TENASSERIM M13\/14 projects (2677km) are available now and IRRAWADDY DELTA offshore is in progress. Vietnam &#8211; the MALAY BASIN project has recently completed (6956km, well-logs from 4 wells). Indonesia &#8211; MALACCA STRAIT and EAST JAVA SEA datasets are now available, plus offshore TARAKAN is underway. See also our extensive existing coverage of the SOUTH CHINA SEA and other areas worldwide.<\/p>\n<p>&nbsp;<\/p>\n<p>ref: 2016-8<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Canesis Data Limited &#8211; South East Asia Project updates Myanmar &#8211; ANDAMAN SEA and TENASSERIM M13\/14 projects (2677km) are available now and IRRAWADDY DELTA offshore is in progress. Vietnam &#8211; the MALAY BASIN project has recently completed (6956km, well-logs from 4 wells). Indonesia &#8211; MALACCA STRAIT and<\/p>\n","protected":false},"author":1,"featured_media":0,"template":"","meta":{"_tribe_events_status":"","_tribe_events_status_reason":"","footnotes":""},"tags":[],"tribe_events_cat":[2],"class_list":["post-145","tribe_events","type-tribe_events","status-publish","hentry","tribe_events_cat-embedded","cat_embedded"],"_links":{"self":[{"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/tribe_events\/145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/tribe_events"}],"about":[{"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/types\/tribe_events"}],"author":[{"embeddable":true,"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":4,"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/tribe_events\/145\/revisions"}],"predecessor-version":[{"id":240,"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/tribe_events\/145\/revisions\/240"}],"wp:attachment":[{"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/media?parent=145"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/tags?post=145"},{"taxonomy":"tribe_events_cat","embeddable":true,"href":"https:\/\/www.energy365.com\/advertising\/wp-json\/wp\/v2\/tribe_events_cat?post=145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}